Internally Cured Concrete as a Solution to Cracking and Lifecycle Issues in Bridge Decks

Hello everyone, I hope y’all are doing well.  I had a pretty good week.  The school year for the school district is winding down so I should only have a few days of substitute teaching left and then a long summer break.  I also know for sure now that I can register for my comprehensive exam and I already know the test date – once that is done I can apply for graduation on my Masters of Engineering program.  I also just got back from floating the river in Gruene, TX which I haven’t done in ages.  All in all, things are looking up.  Today I want to talk about an innovation in curing concrete being researched at Purdue University which could significantly reduce cracks in concrete bridge decks.

The concept being researched is a high strength concrete being cured using an internal curing process and the research shows that it could double the life of the bridge deck.  The concept was first discovered in high strength concrete by Dr. Jason Weiss in 2004.  Further research by Dr. Weiss also showed that there could be a lot of potential uses for moderate grade concrete as well.  The normal curing process works by adding the aggregate, cement mix and water separately.  The way internal curing works is that highly porous aggregate with moisture and cement mix are combined and the curing process occurs from the inside out as the water is pulled out of the aggregate by the cement mix.

Once the appropriate proportions were determined, samples were tested for salt ingress, corrosion and cracking.  The material has now passed the test on samples 15 ft. long and 3 ft. wide.  Along with that, a few bridges built by INDOT have used internally cured concrete as well and they seem to be holding up.  INDOT believes this curing process has potential and plans on moving into full scale field trials while also trying to gain more accurate information on life cycle data.

However, there are a couple challenges with this new process as well.  One challenge is that moisture content of aggregate is much more critical.  It may seem like an easy issue to account for; but if the crew doesn’t have the training to account for this, it could make it more difficult to construct.  The other is that there is a slightly increased up front cost as compared to the traditional process; however, Dr. Weiss believes that the large decrease in maintenance cost in the future should make up for that.

Overall, I believe that this is a promising improvement in the bridge deck curing process.  Not only does it reduce cracking and maintenance cost; it also increases the lifetime of a bridge deck.  Along with that, there is a lack of resources in regards to construction crews and budgets – implementing this process could do a lot to ease the load in both of these areas.  What is your opinion on internally cured concrete?  Do you think the benefits projected by Dr. Weiss are too optimistic, not optimistic enough or mostly accurate?  Thank you for your time and have a good weekend!

 

Source:

“Internally Cured Concrete May Lead to Crack-Resistant Bridge Decks”, Civil Engineering Magazine, May 2013, pg 36-37

Advertisements

Single Post Navigation

2 thoughts on “Internally Cured Concrete as a Solution to Cracking and Lifecycle Issues in Bridge Decks

  1. phdvibe on said:

    Do you think this will really increase the longevity of the deck life? Purdue University is certainly one of the finest structural engineering schools on the planet and I’m excited to follow this project into the future. However, it appears all they’ve done is reduce the initial shrinkage cracks due to residual stresses. This won’t significantly increase the already low (essentially nonexistant) tensile capacity of concrete which will crack over time due to creep, temperature, and negative moment loads over beams and piers. Bridge deck cracking is obviously a tough problem because obviously we don’t want water and salts corroding the steel, but concrete is most efficient when cracking does occur and allows the reinforcing steel to engage (i.e. water and salts could render the reinforcing steel useless, but if cracking doesn’t occur, then the rebar isn’t doing its job and is for all intents and purposes useless anyway). What are your thoughts?

    • Those are all very good points. I think that’s why the article made the point of saying that studies and research are still being conducted to determine the response over time. Looking back, that statement about doubling the lifetime of a concrete bridge deck might have a been a bit suspect considering that statement lol.

      However, I think it would help some. While I agree that this improves longevity in regards to steel exposure and expansion of cracks due to moisture, I thought that it a lot of those other problems got worse once the exposure and moisture expansion issue started.

      Along with that, isn’t creep, temperature, and negative moment loads accounted for in away that is supposed to reduce the probability of cracking a lot? And I was also under the impression that the tensile strength of rebar was still activated before cracking due to the specification of tension controlled limit in design? I know once the tension placed on the concrete gets too extreme the concrete will crack as well, but I thought that if the yielding of the steel due to the normal design loads is limited to a reasonable range cracking should be greatly reduced.

      Thanks for your comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: